You've found the perfect acreage lot at Cardinal Pass or Scenic Bay Estates, and you're ready to build your dream home. But you're wondering: "How long will this actually take from signing the land purchase to getting my keys?"
Most families building custom homes in Minnesota underestimate the timeline, leading to rushed decisions, budget overruns, and unnecessary stress. The truth is, building a custom home on acreage involves multiple phases that must be carefully coordinated—especially in Minnesota where weather plays a significant role in construction schedules.
The internal problem: You're anxious about the unknown timeline and want to plan your current living situation, school enrollment, and work commitments around your move-in date.
The philosophical problem: Your family deserves a clear roadmap for this major life investment, not confusion and uncertainty that comes with poor planning.
At ARC Properties, with over 35 years of land development experience in the South Metro, we've guided hundreds of families through this exact journey. Here's your complete timeline guide to building your custom home in Minnesota.
The Reality: Total Timeline Expectations
Typical Timeline: 12-18 Months Total
- Land purchase and planning: 2-4 months
- Permitting and approvals: 1-3 months
- Construction period: 6-12 months
- Final inspections and move-in: 2-4 weeks
Minnesota-Specific Factors:
- Construction season: April through October for optimal building conditions
- Weather delays: Plan for 2-4 weeks of weather-related delays
- Winter planning: Projects starting after August likely continue into the following spring
According to recent industry data, custom home construction in Minnesota averages 8-10 months, while spec homes average 6-7 months.
Phase 1: Pre-Construction Planning (Months 1-4)
Month 1: Land Selection and Purchase
Week 1-2: Site Selection: When you work with ARC Properties, we help you identify lots that match your building vision:
- Site visits to available residential land options
- Soil analysis review for foundation requirements
- Utility accessibility assessment
- Building orientation planning for natural light and views
Week 3-4: Purchase Process
- Land purchase agreement and earnest money
- Due diligence period for surveys and soil tests
- Financing approval for land purchase
- Closing on your acreage lot
Pro tip: ARC Properties provides soil reports and surveys for all our lots, accelerating this process by 2-3 weeks compared to raw land purchases.
Month 2-3: Design and Planning
Architectural Design Process:
- Initial consultation: Define your vision, budget, and must-haves
- Preliminary designs: Review floor plans and exterior concepts
- Design refinement: Adjust plans based on your lot's specific characteristics
- Final architectural plans: Complete drawings ready for permitting
Builder Selection: Our builder resources network includes pre-vetted contractors experienced with our developments:
- Builder interviews and proposal reviews
- Reference checking and portfolio review
- Contract negotiation and timeline establishment
- Construction loan coordination with your chosen builder
Month 3-4: Permitting and Approvals
Required Permits for Minnesota Construction:
- Building permit: $1,500-$3,500 depending on home size
- Septic permit: $300-$800 (if not connected to municipal sewer)
- Well permit: $200-$500 (if not connected to municipal water)
- Electrical permit: $150-$400
- Driveway permit: $100-$300
Timeline Variables:
- Simple designs: 4-6 weeks for permit approval
- Complex/unique designs: 8-12 weeks for approval
- Winter applications: Add 2-4 weeks due to reduced city staff availability
Scott County and Prior Lake typically process permits faster than larger municipalities, averaging 6-8 weeks for standard residential construction.
Phase 2: Site Preparation and Foundation (Months 5-6)
Month 5: Site Work and Excavation
Early Spring Preparation (March-April):
- Site staking and survey markers
- Utility marking and excavation planning
- Driveway installation or temporary access roads
- Construction staging area setup
Excavation and Foundation Prep:
- Excavation: 3-5 days for basement/foundation
- Footings: 2-3 days for concrete footings
- Foundation walls: 1-2 weeks depending on basement size
- Waterproofing and backfill: 3-5 days
Cost Expectations:
- Site preparation: $3,000-$8,000
- Foundation (slab-on-grade): $6,000-$12,000
- Foundation (full basement): $20,000-$50,000+
Month 6: Foundation and Utilities
Foundation Completion:
- Concrete curing time: 7-14 days before framing
- Foundation inspection: 1-2 days
- Rough utility installation: 3-7 days
Critical Timeline Note: Foundation work must be completed before Minnesota's freeze-thaw cycles begin (typically mid-November through mid-March).
Phase 3: Construction Phase (Months 7-12)
Months 7-8: Framing and Structural Work
Framing Schedule:
- Floor systems: 2-3 days
- Wall framing: 1-2 weeks
- Roof framing: 3-5 days
- Sheathing and weather protection: 2-3 days
Structural Inspections:
- Framing inspection: After walls and roof complete
- Structural adjustments: 1-3 days if needed
Weather Impact: Summer framing typically proceeds on schedule, while spring/fall framing may face 1-2 week delays due to rain.
Months 8-9: Mechanical Systems
Rough-In Phase:
- Plumbing rough-in: 3-5 days
- Electrical rough-in: 3-7 days
- HVAC installation: 5-10 days
- Insulation: 2-3 days
Inspections Required:
- Electrical rough inspection
- Plumbing rough inspection
- HVAC inspection
Total phase duration: 3-4 weeks
Months 9-11: Interior Finishes
Drywall and Paint:
- Drywall installation: 1-2 weeks
- Texture and primer: 3-5 days
- Paint: 1-2 weeks
Flooring and Trim:
- Hardwood flooring: 1-2 weeks
- Tile work: 1-2 weeks
- Carpeting: 2-3 days
- Interior trim: 1-2 weeks
Kitchen and Bathrooms:
- Cabinet installation: 1-2 weeks
- Countertop installation: 2-3 days
- Fixture installation: 3-5 days
Month 12: Final Phase
Completion Items:
- Exterior finishes: Siding, stone, or brick completion
- Final electrical: Switch and outlet installation
- Final plumbing: Fixture installation and testing
- Appliance installation: 1-2 days
- Final cleanup: 2-3 days
Phase 4: Final Inspections and Move-In (Month 13)
Inspection Process
Required Final Inspections:
- Final electrical inspection
- Final plumbing inspection
- Final building inspection
- Certificate of Occupancy: Issued after all inspections pass
Timeline: 1-2 weeks for all final inspections
Pre-Move-In Activities
Final Walkthrough (Week 1):
- Punch list creation: Document any incomplete or defective items
- Systems orientation: Learn your home's mechanical systems
- Warranty documentation: Review builder warranties
Closing Preparation (Week 2):
- Final loan approval: Construction-to-permanent loan conversion
- Title work completion
- Homeowner's insurance activation
- Utility transfers: Set up electricity, gas, water, internet
Move-In Day (Week 3-4):
- Final walkthrough with builder
- Key exchange and garage door openers
- Welcome home!
Seasonal Timing Strategy for Minnesota Builds
Optimal Start Times:
Early Spring Start (March-April):
- Advantages: Full construction season ahead, optimal weather
- Move-in target: December-January
- Best for: Families wanting to start new school year in new home
Late Spring Start (May-June):
- Advantages: Stable weather, contractor availability
- Move-in target: February-March
- Best for: Buyers with flexible timeline
Summer Start (July-August):
- Considerations: Foundation must be complete before freeze
- Move-in target: Following summer
- Strategy: Focus on planning and permits, delay excavation until following spring
Minnesota Weather Impact
Spring (March-May):
- Challenges: Mud season, frost delays
- Typical delays: 1-2 weeks
Summer (June-August):
- Optimal conditions: Longest working days, stable weather
- Minimal delays: Weather rarely impacts schedule
Fall (September-November):
- Race against winter: Must reach "dried-in" stage before snow
- Potential delays: 2-4 weeks if winter arrives early
Winter (December-February):
- Exterior limitations: Minimal exterior work possible
- Interior focus: Electrical, plumbing, finishes can continue
- Heating requirements: Temporary heating for interior work
Common Timeline Disruptors and How to Avoid Them
Permitting Delays
Common Issues:
- Incomplete architectural plans
- Zoning questions
- Environmental concerns
ARC Properties Advantage: Our lots come with pre-approved development standards, reducing permit review time by 3-4 weeks.
Material and Labor Shortages
Prevention Strategies:
- Early ordering: Lock in materials during planning phase
- Builder relationships: Work with contractors who have established supplier relationships
- Flexible specifications: Allow approved alternatives if primary choices become unavailable
Change Orders
Budget impact: Changes during construction add 2-4 weeks and 10-20% cost
Prevention: Finalize all decisions during planning phase
Weather Delays
Typical impacts: 2-4 weeks total delay in Minnesota
Mitigation: Build buffer time into your timeline expectations
Working with ARC Properties: Timeline Advantages
Streamlined Process Benefits
Pre-Development Work:
- Soil analysis completed before you purchase
- Utility planning coordinated with local authorities
- Building envelopes identified for optimal home placement
- Permit-ready lot information available immediately
Builder Network Access: Our builder resources partners understand our lots and development standards:
- Faster permitting due to familiarity with our developments
- Accurate timeline estimates based on experience with similar projects
- Established material supplier relationships
Project Management Support
Timeline Coordination:
- Monthly progress meetings with your builder
- Issue resolution facilitation between all parties
- Quality oversight ensuring construction meets standards
Timeline Comparison: ARC Properties vs. Raw Land
Building on ARC Properties Lots:
- Land selection to permits: 2-3 months
- Construction period: 6-9 months
- Total timeline: 8-12 months
Building on Raw Land:
- Site analysis and preparation: 3-6 months
- Permitting and approvals: 3-6 months
- Construction period: 8-12 months
- Total timeline: 14-24 months
Time savings with ARC Properties: 4-8 months average
Budget Timeline: When to Expect Major Expenditures
Pre-Construction (Months 1-4):
- Land purchase: Full payment at closing
- Architectural fees: 50% upfront, 50% at plan completion
- Permits and surveys: Full payment when applications submitted
Construction Phase (Months 5-12):
- Construction draws: Released monthly based on completion milestones
- Typical draw schedule: 10% site work, 15% foundation, 20% framing, 25% mechanical rough-in, 20% finishes, 10% completion
Final Phase (Month 13):
- Final construction payment: 5-10% retained until punch list completion
- Closing costs: Loan conversion fees and title costs
- Moving expenses: Budget $2,000-$5,000 for professional movers
Success Story: The Anderson Family Timeline
The Anderson family purchased a 3.2-acre lot at Cardinal Pass in March 2024. Here's their actual timeline:
Month 1 (March): Lot selection and purchase at Cardinal Pass
Month 2 (April): Architect selection and initial design meetings
Month 3 (May): Final plans completed, builder contracts signed
Month 4 (June): Permits submitted and approved
Month 5 (July): Excavation and foundation work
Month 6 (August): Framing and roof completion
Month 7-9 (Sept-Nov): Mechanical systems and drywall
Month 10-12 (Dec-Feb): Interior finishes during winter months
Month 13 (March): Final inspections and move-in
Result: 13-month timeline from lot purchase to move-in, exactly as projected.
Planning Your Timeline: Next Steps
6 Months Before Building:
- Secure land purchase with ARC Properties
- Interview architects and builders
- Establish construction financing
3 Months Before Building:
- Finalize architectural plans
- Submit permit applications
- Order long-lead-time materials
1 Month Before Building:
- Confirm all permits approved
- Schedule excavation contractor
- Set up temporary utilities
Building Season (April-October):
- Weekly site visits and progress meetings
- Maintain change order log
- Prepare for winter interior work if needed
Make Your Timeline Work
Building your dream home on South Metro acreage doesn't have to be stressful when you understand the timeline and work with experienced partners. The key is starting with the right land that streamlines the entire process.
Ready to begin your home building journey?
Immediate Next Steps:
- Explore available lots: Visit Cardinal Pass or Harvest Bluffs to see our current inventory
- Schedule a consultation: Contact our team to discuss timeline expectations for your specific situation
- Review financing options: Connect with our recommended construction lenders for pre-approval
Contact ARC Properties Today:
- Phone: (952) 292-6231
- Website: propertiesbyarc.com
- Visit our office: Discuss your timeline in person with our experienced team
Your family's custom home on beautiful South Metro acreage is 12-18 months away from reality. Let ARC Properties help you navigate the timeline successfully, avoiding delays and cost overruns that plague many custom home projects.
Start your timeline today—your dream home awaits.